School Infrastructures and Heating: Saadaoui raises his voice over delays

Eliminating overcrowding in schools and commissioning heating equipment before the arrival of cold weather rank among the priorities of the Ministry of National Education. During a videoconference meeting held Wednesday, Mohamed Seghir Saadaoui urged education directors to expedite the completion of projects registered under the 2026 program, remove obstacles holding back construction sites, and strengthen field inspections to guarantee the proper functioning of heating devices.

Bringing together central administration executives, education directors, and delegated directors via videoconference on Wednesday, Mohamed Seghir Saadaoui set two priorities, namely unblocking lagging construction sites and securing school heating. He called for intensifying on-site monitoring of the various projects and lifting the constraints delaying their completion.

This meeting provided an opportunity to take stock of the progress status of the sector’s educational infrastructure construction program, as well as the preparation of heating equipment ahead of the winter season.

On this occasion, Mohamed Seghir Saadaoui highlighted the importance of the financial appropriations granted to the sector under the 2026 budget, particularly in terms of investment. He considered that these resources reflect the interest shown by public authorities in bolstering school infrastructures and improving schooling conditions.

The minister underscored that the new projects registered across the various provinces should help substantially reduce pressure on existing facilities. In this regard, he called for mobilizing all human and material resources to ensure their completion within allotted deadlines and according to required standards.

To pick up the pace of work, the sector’s top official insisted on strengthening coordination between education directorates, governors, and public facilities directorates. He notably requested that projects falling under his department advance at the same pace as those included in the programs of the ministries of Housing and the Interior, particularly educational infrastructures planned in new integrated residential developments.

Rigorous site monitoring and the removal of administrative and technical bottlenecks also stood at the center of ministerial instructions. Education directors are thus called upon to identify stalled projects or those where work has not yet commenced, determine the causes of delays, and forward encountered difficulties to the central administration to enable intervention with the relevant bodies.

The minister also tasked the secretaries general of education directorates as well as the heads of programming and monitoring departments to ensure direct follow-up of the school infrastructure file, under the supervision of education directors. Files for middle and high school projects whose studies are finalized must, furthermore, be transmitted without delay to the planning directorate to initiate the necessary procedures for their execution.

In anticipation of dropping temperatures, the minister also paid special attention to the issue of heating in educational institutions. He instructed the relevant officials to step up field checks, notably using the dedicated digital platform, to verify the proper operation and availability of heating appliances.

Periodic maintenance operations must be carried out, while reported breakdowns and malfunctions must undergo swift repairs. The objective is to guarantee students suitable and safe schooling conditions during the winter season.

Saadaoui, finally, reiterated the necessity of daily processing of project progress and improved coordination between local and central services as well as partner sectors. He emphasized the importance of promptly reporting difficulties encountered in order to accelerate the delivery of scheduled infrastructures and translate mobilized budgets into equipment and facilities effectively placed at the disposal of students.